End-to-End Commissioning & Automation
From pre-functional testing to final acceptance, Titan delivers the technical rigor hyperscale data centers demand.
Commissioning Planning
We develop comprehensive Cx plans, owner's project requirements, and basis of design documentation that set the standard for your entire project lifecycle.
- OPR & BOD development
- Cx plan authoring
- Pre-construction coordination
- Design review & issue tracking
Startup & Commissioning
Our field teams execute pre-functional checklists, functional performance testing, and integrated systems testing across all critical infrastructure systems.
- Pre-functional checklists
- Functional performance testing
- Integrated systems testing
- Deficiency tracking & resolution
Controls Integration
We bridge the gap between controls vendors and facility operations — verifying BMS, EPMS, and DCIM systems perform as designed under real-world conditions.
- BMS/EPMS verification
- DCIM integration testing
- Sequence of operations validation
- Alarm & setpoint verification
Testing & Verification
Rigorous acceptance testing protocols ensure every system — power, cooling, fire/life safety, and security — meets specification before handover.
- Electrical system testing
- Mechanical system testing
- Fire/life safety verification
- Final acceptance documentation
Retro-Commissioning
For existing facilities, we identify operational deficiencies, optimize system performance, and document findings to extend infrastructure lifespan.
- Operational assessment
- Performance benchmarking
- Deficiency remediation
- Updated as-built documentation
Owner's Representative
We serve as your technical advocate throughout design and construction — protecting your investment and ensuring contractor accountability.
- Design phase oversight
- Construction administration
- RFI & submittal review
- Contractor coordination
Our Process
A disciplined, phase-gated approach that eliminates surprises at startup.
Mobilize
We embed with your project team early — reviewing design documents, aligning with the GC, and building the Cx plan before ground breaks.
Pre-Functional
Component-level verification of every installed system. Nothing moves to functional testing until pre-functional checklists are complete and signed.
Functional Testing
System-level performance testing against the OPR. Every sequence, every alarm, every failover — tested, documented, and resolved.
Integrated Testing
Full-facility integrated systems testing simulating real operational scenarios, including loss-of-utility and emergency response sequences.
Acceptance
Final documentation package delivered to the owner — Cx report, deficiency log, O&M recommendations, and as-commissioned drawings.
Ready to Commission Your Facility?
Tell us about your project and we'll put together a commissioning approach tailored to your timeline and requirements.
Start a Conversation