What We Do

End-to-End Commissioning & Automation

From pre-functional testing to final acceptance, Titan delivers the technical rigor hyperscale data centers demand.

Commissioning Planning

We develop comprehensive Cx plans, owner's project requirements, and basis of design documentation that set the standard for your entire project lifecycle.

  • OPR & BOD development
  • Cx plan authoring
  • Pre-construction coordination
  • Design review & issue tracking

Startup & Commissioning

Our field teams execute pre-functional checklists, functional performance testing, and integrated systems testing across all critical infrastructure systems.

  • Pre-functional checklists
  • Functional performance testing
  • Integrated systems testing
  • Deficiency tracking & resolution

Controls Integration

We bridge the gap between controls vendors and facility operations — verifying BMS, EPMS, and DCIM systems perform as designed under real-world conditions.

  • BMS/EPMS verification
  • DCIM integration testing
  • Sequence of operations validation
  • Alarm & setpoint verification

Testing & Verification

Rigorous acceptance testing protocols ensure every system — power, cooling, fire/life safety, and security — meets specification before handover.

  • Electrical system testing
  • Mechanical system testing
  • Fire/life safety verification
  • Final acceptance documentation

Retro-Commissioning

For existing facilities, we identify operational deficiencies, optimize system performance, and document findings to extend infrastructure lifespan.

  • Operational assessment
  • Performance benchmarking
  • Deficiency remediation
  • Updated as-built documentation

Owner's Representative

We serve as your technical advocate throughout design and construction — protecting your investment and ensuring contractor accountability.

  • Design phase oversight
  • Construction administration
  • RFI & submittal review
  • Contractor coordination

Our Process

A disciplined, phase-gated approach that eliminates surprises at startup.

01

Mobilize

We embed with your project team early — reviewing design documents, aligning with the GC, and building the Cx plan before ground breaks.

02

Pre-Functional

Component-level verification of every installed system. Nothing moves to functional testing until pre-functional checklists are complete and signed.

03

Functional Testing

System-level performance testing against the OPR. Every sequence, every alarm, every failover — tested, documented, and resolved.

04

Integrated Testing

Full-facility integrated systems testing simulating real operational scenarios, including loss-of-utility and emergency response sequences.

05

Acceptance

Final documentation package delivered to the owner — Cx report, deficiency log, O&M recommendations, and as-commissioned drawings.

Ready to Commission Your Facility?

Tell us about your project and we'll put together a commissioning approach tailored to your timeline and requirements.

Start a Conversation
Titan Automation and Commissioning

Specialty commissioning contractor for hyperscale data center infrastructure. Built for Nevada's growing digital backbone.

Contact

Nevada, USA

Serving the Greater Nevada Market

info@titanac.llc

© 2026 Titan Automation and Commissioning. All rights reserved.

Nevada Specialty Contractor · Hyperscale Data Center Commissioning